top of page

PROJECT: FAIRFIELD UNIVERSITY
Snowmelt Exterior Stairwell

Project: Heated Exterior Stairwell, Barone Campus Center

Type: Steel Frame Exterior Escape Stairway

Client: Dicin Electric

Owner: Fairfield University

Year: 2020

Location of Install:  USA

Deployment: USA

 

Scope of Supply

  • Design

  • Arctic Pad® & Arctic Treads 

  • Control & Monitoring

  • Installation Support

Project Description

The Barone Campus at Fairfield University underwent a complete transformation of the interior, exterior and equipment as an energy efficient and modern upgrade for the university.  As the leading experts in winterization AMS® was chosen.  This project consisted of Arctic Pad® for the landing areas and treads for a steel exterior escape stairwell.  This snowmelt system was seamlessly installed by Dicin Electric. 

The Advanced Mat System® operates on a control system that monitors ambient temperature allowing for the Arctic Pads to automatically turn on and off as needed. 

Customer Service: 1-403-910-1492

E-Mail: sales@advancedmatsystems.com

Calgary, AB  Canada     Alvin, TX USA

© 2011 Advanced Mat Systems Inc. All rights reserved

© 2011 AMS. All rights reserved

© 2011 Arctic Pad.  All rights reserved

ARCTIC PAD Patent No. 2606792

AMS© Inc ISO 9001-2015 Compliance

Contact Us

Thanks for submitting!

bottom of page